PRODUCT INFO |
Type Of Material To Be Cubed: |
Type of Baled material to be Ground: |
What Process Did It Come From: |
Ethanol Alcohol Other |
Particle Size: |
Materials Average Moisture Content: % |
Average Production Per Year: Tons # Of Months: |
What Form Do You Receive It In: |
Loose Bales Other |
Hours Of Production: |
24 hours/day = 20 hours cubing Tons 12 hours/day = 10 hours cubing Tons 8 hours/day = 9 hours cubing Tons |
How Will Finished Cubes Be Handled: |
Where Will Feed Be Used: (if applicable) |
Feedlot Horse Dairies Other |
Where Will Fuel Be Used: |
Cogeneration Plant Public Utility Steam Generation Other |
End User Will Be: |
Type Boiler: |
|
Present BTU Value: |
/ Pound |
Current Fuel Size: |
3/8" 3/4" 1 1/4" Pulverized - Size |
Current Fuel Consumption: Tons Per Hour |
Present Fuel Cost: Ton |
Approximate Project Beginning: |
3 months 6 months 9 months 1 year longer |
Comments:
|