|
|
|
Cuber Models
Model 250 Cuber
Production: 6 to 8 tons per hour
Material: Mixed Paper/FBF, Cardboard, MSW (dRDF), Cardboard Sludge, Paper Sludge
Note: Production depends on how clean the material is prior to cubing.
|
|
|
|
|
Model 250-W Cuber
Production: 4 to 6 tons per hour
Material: Planer Shavings, Sander Dust
Note: Production depends on how clean the material is prior to cubing.
|
Model 300 (300-W) Cuber
Production: 6 to 8 tons per hour
Material: Mixed Paper/FBF, Cardboard, MSW (dRDF), Cardboard Sludge, Paper Sludge, Planer Shavings, Sander Dust
Note: Production depends on how clean the material is prior to cubing.
|
|
|
|
|
|